Still growing — Armenian mining operator increases power plant capacity Post author:MiamiCrypto Post published:August 24, 2022 Post category:Armenia / Cryptocurrency / ECOS / Hrazdan Power Plant / Mining As cryptocurrency mining operators look for new locations, an Armenian firm has added an additional 60MW cloud hosting facility based at a local power plant. You Might Also Like Crypto mining’s cost: How has hardware availability changed the industry? March 9, 2022 Australia Issues White Paper for Central Bank Digital Currency September 28, 2022 Bosnian court sides with Bitcoin miner in frozen bank account case March 29, 2022